al fahad projects > UNMAS nontechnical Survey
This Agreement is made and is effective this 2nd day of April, 2016, by and between Sterling International Group, LLC., located at 2229 Old Highway 95, Lenoir City, Tennessee, 37771 (hereinafter referred to as “Sterling”), and Al-Fahad Mines Removal Limited Liability Company, located at Building 12, 17th July Street, Ramadi, Al Anbar, Iraq, (hereinafter referred to as “Subcontractor”). For the purposes of this Agreement, SIG and Subcontractor may be collectively referred to as the “Parties "or individually referred to as a “Party”.

Al-Fahd Company contracted with the American GA nous Company and Sterling Company to carry out investigations and clearing of all infrastructures in Al-Anbar Governorate and Ninawa Governorate , which are considered destructive or semi-destructive as a result of terrorist and military actions. The company has made every effort to cleanse the areas as quickly as possible so that the displaced families can return to their homes. Below is a summary of the work carried out by Al-Fahd in these governorates:
Completed Areas 100% : 136 points | Size of Area : 4,987,263 m2 | IED treated : 3167 | UXO treated : 12702
Completed Areas 100% : 52 points | Size of Area : 8,306,416 m2 | IED treated : 760 | UXO treated : 18183