al fahad projects > Sea-line Project
(the “Sea Line Project”), which is financed and supported through the Japanese Official Development Assistance (ODA) Loan by Japan International Cooperation Agency (JICA). The Project involves the development of two offshore platforms, a 75 kilometer 48” oil pipeline and a Single Point Mooring system.
Al Fahd Company for mine removal was contacted and initiated work within this project before the date of 21 of December 2012 as a third party contractor for Offshore PTE ltd.


Free works carried out by Al-Fahd Company 2016


Non-technical surveying works: in agreement with the Iraqi Mines Affairs Department in Anbar Governorate, which included the liberated areas and the preparation of technical maps, which were later used as a basis for carrying out surveying and mine removal work by all companies and specialized organizations, and this has been accomplished. Work at the expense of Al-Fahd Company.

Our company has been assigned to carry out multiple free disinfection works that included a 4.5 km power line in Fallujah. In addition to that, a number of arches, rural roads, parks and rural schools as well.