This Agreement is made and is effective this 2nd day of April, 2016, by and between Sterling International Group, LLC., located at 2229 Old Highway 95, Lenoir City, Tennessee, 37771 (hereinafter referred to as “Sterling”), and Al-Fahad Mines Removal Limited Liability Company, located at Building 12, 17th July Street, Ramadi, Al Anbar, Iraq, (hereinafter referred to as “Subcontractor”). For the purposes of this Agreement, SIG and Subcontractor may be collectively referred to as the “Parties "or individually referred to as a “Party”.
Al-Fahd Company contracted with the American GA nous Company and Sterling Company to carry out investigations and clearing of all infrastructures in Al-Anbar Governorate and Ninawa Governorate , which are considered destructive or semi-destructive as a result of terrorist and military actions. The company has made every effort to cleanse the areas as quickly as possible so that the displaced families can return to their homes. Below is a summary of the work carried out by Al-Fahd in these governorates:
Completed Areas 100% : 136 points | Size of Area : 4,987,263 m2 | IED treated : 3167 | UXO treated : 12702
Completed Areas 100% : 52 points | Size of Area : 8,306,416 m2 | IED treated : 760 | UXO treated : 18183
al fahad projects > UNMAS Risk Analysis
al fahad projects > Sterling Survey And Clearance Project
This subcontract is based on the original contract which have been signed by the First Party with UNMAS (which will be called here “the Customer”), which is a Threat and Impact Assessment to be executed in Ramadi - Al Anbar Province, and according to the guidance and instructions of the customer.
1
Services provided: IEDD, EOD, NTS, TS, BAC, CLO
2
Starting Date : 21 March 2016
3
Area of Operations: Ninawa and AlAnbar
4
Location : Infrastructure Facilities ( Hospitals, universities, schools, electrical stations, water stations, power lines, etc..)
5
Team deployed : Ninawa ( 16 – Team + 2 CLO teams)
6
Team deployed : AlAnbar ( 16 – Team + 2 CLO teams)
Completed Areas 100% : 136 points | Size of Area : 4,987,263 m2 | IED treated : 3167 | UXO treated : 12702
Completed Areas 100% : 52 points | Size of Area : 8,306,416 m2 | IED treated : 760 | UXO treated : 18183
(the “Sea Line Project”), which is financed and supported through the Japanese Official Development Assistance (ODA) Loan by Japan International Cooperation Agency (JICA). The Project involves the development of two offshore platforms, a 75 kilometer 48” oil pipeline and a Single Point Mooring system.
Al Fahd Company for mine removal was contacted and initiated work within this project before the date of 21 of December 2012 as a third party contractor for Offshore PTE ltd.
Free works carried out by Al-Fahd Company 2016
Non-technical surveying works: in agreement with the Iraqi Mines Affairs Department in Anbar Governorate, which included the liberated areas and the preparation of technical maps, which were later used as a basis for carrying out surveying and mine removal work by all companies and specialized organizations, and this has been accomplished. Work at the expense of Al-Fahd Company.
Our company has been assigned to carry out multiple free disinfection works that included a 4.5 km power line in Fallujah. In addition to that, a number of arches, rural roads, parks and rural schools as well.
al fahad projects > Threat and Impact Assessment in Fallujah - Al Anbar Province
provide six search and clearance teams, medical cover, risk awareness teams and their own life support teams. A summary of requirements is listed below:
1
6 x Team leader
2
30 x De-miners
3
2 x IEDD Assistants
4
2 x Risk Awareness Team Leader
5
2 x male and 2 x female Risk Awareness Educators
6
10 x Cars
7
4 x Ambulance & 4 x Driver
8
4 x Security
al fahad projects > Survey and clearance in Fallujah 1 - Iraq
provide six search and clearance teams, medical cover, risk awareness teams and their own life support teams. A summary of requirements is listed below: